Shawfair Factory Fit Out

Client: Muir Construction

Area: 700m2

Material: 2 Coats HB Epoxy to match client RAL

IRS was awarded the contract to carry out the preparation of the existing concrete substrate and thereafter apply two coats of high-build epoxy coatings to two separate areas.

IRS Industrial Resin Systems

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.Lorem ipsum dolor sit amet consectetur adipiscing elit dolor